Impact: High | | 19/07/2022 | 31/12/2025 | Cheshire East Council |
Impact: High | | 16/01/2023 | 15/01/2026 | Network Rail Infrastructure Ltd |
Impact: High | Mill Farm Drive, Crewe. Emergency access will be maintained where possible Road closure scheduled 29/02/2024 - 31/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 29/02/2024 | 31/12/2025 | Cheshire East Council |
Impact: High | | 10/04/2024 | 31/03/2026 | Cheshire East Council |
Impact: High | | 17/05/2024 | 19/12/2025 | Cheshire East Council |
Impact: High | | 22/09/2024 | 26/02/2026 | Cheshire East Council |
Impact: Medium | | 02/01/2025 | 31/03/2026 | Cheshire East Council |
Impact: High | Pickmere Lane, Pickmere. Emergency access will be maintained where possible Road closure scheduled 10/01/2025 - 31/03/2026 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 10/01/2025 | 31/03/2026 | Cheshire East Council |
Impact: High | Park Lane, Poynton. Emergency access will be maintained where possible Road closure scheduled 13/01/2025 - 12/08/2028 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 13/01/2025 | 12/08/2028 | Cheshire East Council |
Impact: High | Baddington Lane, Baddington. Emergency access will be maintained where possible Road closure scheduled 13/01/2025 - 12/01/2028 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 13/01/2025 | 12/01/2028 | Cheshire East Council |
Impact: High | | 15/01/2025 | 31/03/2026 | Cheshire East Council |
Impact: Low | Highway improvement / development works exact dates to be confirmed full extent. Emergency access will be maintained where possible Road closure scheduled 01/02/2025 - 12/01/2028 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 01/02/2025 | 12/01/2028 | Cheshire East Council |
Impact: High | S278 - Installation of new footpath and carriage into existing carriageway. Works completed by McPhillips Ltd. Emergency 24/7 contact Traffix 0800819901. Roadworks scheduled 03/02/2025 - 31/01/2026 (Cheshire East Council)
| 03/02/2025 | 31/01/2026 | Cheshire East Council |
Impact: High | Advanced planning - dates to be confirmed. Emergency access will be maintained where possible Road closure scheduled 18/04/2025 - 17/10/2026 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 18/04/2025 | 17/10/2026 | Cheshire East Council |
Impact: High | Buckingham Road, Wilmslow. Emergency access will be maintained where possible Road closure scheduled 18/04/2025 - 17/10/2026 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 18/04/2025 | 17/10/2026 | Cheshire East Council |
Impact: High | | 24/05/2025 | 23/11/2026 | Cheshire East Council |
Impact: Medium | | 02/06/2025 | 31/01/2026 | Cheshire East Council |
Impact: Low | | 23/06/2025 | 27/01/2026 | Cheshire East Council |
Impact: High | | 23/06/2025 | 27/01/2026 | Cheshire East Council |
Impact: Medium | | 12/07/2025 | 12/01/2026 | Cheshire East Council |
Impact: High | | 21/07/2025 | 27/01/2026 | Cheshire East Council |
Impact: High | Cycleway Scheme/Resurfacing/Crossing Installation/Junction Upgrades 24/7 Two Way Lights - 26/08/2025 - 15/09/2025, 02/10/2025 - 15/10/2025, 27/10/2025 - 13/11/2025, 21/11/2025 - 02/12/202. 4 Way Lights - 03/12/2025 - 16/01/2026, 20/01/2025 - 23/01/2026, 26/01/2026 - 04/02/2026, 13/02/2026 - 20/02/2026 Roadworks scheduled 26/08/2025 - 20/02/2026 (Cheshire East Council) - Traffic control (multi-way signals)
| 26/08/2025 | 20/02/2026 | Cheshire East Council |
Impact: Medium | Cycleway Scheme/Resurfacing/Crossing Installation/Junction Upgrades 24/7 Two Way Lights - 26/08/2025 - 15/09/2025, 02/10/2025 - 15/10/2025, 27/10/2025 - 13/11/2025, 21/11/2025 - 02/12/202. 4 Way Lights - 03/12/2025 - 16/01/2026, 20/01/2025 - 23/01/2026, 26/01/2026 - 04/02/2026, 13/02/2026 - 20/02/2026 Roadworks scheduled 26/08/2025 - 20/02/2026 (Cheshire East Council) - Traffic control (multi-way signals)
| 26/08/2025 | 20/02/2026 | Cheshire East Council |
Impact: High | | 29/08/2025 | 05/01/2026 | Cheshire East Council |
Impact: High | | 22/09/2025 | 26/02/2026 | Cheshire East Council |
Impact: Medium | | 26/09/2025 | 31/03/2026 | Cheshire East Council |
Impact: Medium | | 26/09/2025 | 31/03/2026 | Cheshire East Council |
Impact: High | Standing Stone Road, Macclesfield Forest. Emergency access will be maintained where possible Road closure scheduled 11/10/2025 - 28/02/2026 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 11/10/2025 | 28/02/2026 | Cheshire East Council |
Impact: High | | 21/10/2025 | 15/12/2025 | Cheshire East Council |
Impact: Medium | | 04/11/2025 | 01/12/2026 | Cheshire East Council |
Impact: Low | Gatefield Street, Crewe. Emergency access will be maintained where possible Road closure scheduled 18/11/2025 - 04/01/2026 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 18/11/2025 | 04/01/2026 | Cheshire East Council |
Impact: Medium | Excavate to lay cable. Footway to be primary placement of Cable. Excavate and Install Duct System on Junction of ERF Way / Pochin Way and continue to excavate north along Pochin Way (Footway) Roadworks scheduled 19/11/2025 - 11/01/2026 (SP Energy Networks) - Traffic control (multi-way signals)
| 19/11/2025 | 11/01/2026 | SP Energy Networks |
Impact: High | | 20/11/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | Budworth Road, Tabley. Emergency access will be maintained where possible Road closure scheduled 20/11/2025 - 31/03/2026 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 20/11/2025 | 31/03/2026 | Cheshire East Council |
Impact: High | | 29/11/2025 | 12/12/2025 | SP Energy Networks |
Impact: High | | 30/11/2025 | 12/12/2025 | SP Energy Networks |
Impact: Medium | Excavate, track, backfill & reinstate for New Services & Deloop Roadworks scheduled 01/12/2025 - 14/12/2025 (SP Energy Networks) - Traffic control (multi-way signals)
| 01/12/2025 | 14/12/2025 | SP Energy Networks |
Impact: Medium | | 01/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 01/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 01/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 01/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: High | Slip Road Southbound, Wilmslow. Emergency access will be maintained where possible Road closure scheduled 01/12/2025 - 19/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 01/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: High | | 03/12/2025 | 17/12/2025 | Cadent |
Impact: Medium | | 03/12/2025 | 12/12/2025 | SP Energy Networks |
Impact: Medium | | 03/12/2025 | 10/12/2025 | BT |
Impact: High | | 03/12/2025 | 31/12/2025 | Cheshire East Council |
Impact: Medium | Trace, then excavate to repair gas escape and reinstate where possible Roadworks scheduled 03/12/2025 - 11/12/2025 (Cadent)
| 03/12/2025 | 11/12/2025 | Cadent |
Impact: Medium | | 04/12/2025 | 10/12/2025 | United Utilities Water |
Impact: High | S50 works to carry out 3x joint bays. Works to be completed by Aptus Utilities Ltd, Emergency contact number 01204 325 000. Roadworks scheduled 04/12/2025 - 15/12/2025 (Cheshire East Council) - Traffic control (multi-way signals)
| 04/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | Ruskin Road, Crewe. Emergency access will be maintained where possible Road closure scheduled 04/12/2025 - 10/12/2025 due to Roadworks / License - Roadworks works (SP Energy Networks)
| 04/12/2025 | 10/12/2025 | SP Energy Networks |
Impact: Medium | | 04/12/2025 | 12/12/2025 | United Utilities Water |
Impact: Medium | | 04/12/2025 | 20/12/2025 | National Highways |
Impact: Medium | | 05/12/2025 | 11/12/2025 | SP Energy Networks |
Impact: Medium | | 05/12/2025 | 12/12/2025 | Electricity North West Limited |
Impact: Medium | | 06/12/2025 | 12/12/2025 | United Utilities Water |
Impact: High | | 06/12/2025 | 10/12/2025 | Virgin Media |
Impact: High | Radway Green Road, Barthomley. Emergency access will be maintained where possible Road closure scheduled 06/12/2025 - 12/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 06/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 07/12/2025 | 12/12/2025 | SP Energy Networks |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | United Utilities Water |
Impact: Medium | | 08/12/2025 | 10/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 12/12/2025 | SP Energy Networks |
Impact: High | | 08/12/2025 | 12/12/2025 | Electricity North West Limited |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | Access maintained for
Cyclists Dismount
Emergency Vehicles
Resident
Pedestrians. Emergency access will be maintained where possible Road closure scheduled 08/12/2025 - 12/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | Access maintained for
Cyclists Dismount
Emergency Vehicles
Resident
Pedestrians. Emergency access will be maintained where possible Road closure scheduled 08/12/2025 - 12/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | Mill Lane, Smallwood. Emergency access will be maintained where possible Road closure scheduled 08/12/2025 - 12/12/2025 due to Roadworks / License - Roadworks works (BT)
| 08/12/2025 | 12/12/2025 | BT |
Impact: High | Ancoats Lane, Mobberley. Emergency access will be maintained where possible Road closure scheduled 08/12/2025 - 16/12/2025 due to Roadworks / License - Roadworks works (Electricity North West Limited)
| 08/12/2025 | 16/12/2025 | Electricity North West Limited |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 10/12/2025 | United Utilities Water |
Impact: Medium | | 08/12/2025 | 22/12/2025 | United Utilities Water |
Impact: Medium | | 08/12/2025 | 10/12/2025 | United Utilities Water |
Impact: High | | 08/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 12/12/2025 | BT |
Impact: High | | 08/12/2025 | 12/12/2025 | SP Energy Networks |
Impact: High | Agden Lane, Agden. Emergency access will be maintained where possible Road closure scheduled 08/12/2025 - 12/12/2025 due to Roadworks / License - Roadworks works (United Utilities Water)
| 08/12/2025 | 12/12/2025 | United Utilities Water |
Impact: High | | 08/12/2025 | 11/12/2025 | United Utilities Water |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 08/12/2025 - 10/12/2025 (BT)
| 08/12/2025 | 10/12/2025 | BT |
Impact: High | Warmingham Road, Warmingham. Emergency access will be maintained where possible Road closure scheduled 08/12/2025 - 11/12/2025 due to Roadworks / License - Roadworks works (United Utilities Water)
| 08/12/2025 | 11/12/2025 | United Utilities Water |
Impact: High | | 08/12/2025 | 11/12/2025 | United Utilities Water |
Impact: High | | 08/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 16/12/2025 | Cheshire East Council |
Impact: High | | 08/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: Medium | | 08/12/2025 | 31/01/2026 | Cheshire East Council |
Impact: High | | 08/12/2025 | 12/12/2025 | United Utilities Water |
Impact: Medium | | 09/12/2025 | 10/12/2025 | Netomnia Limited |
Impact: Medium | NANTWICH 1346032 - POLING WORKS - Excavate for new BT Openreach Pole (s) or to Replace Existing BT Openreach Pole (s) in to facilitate overhead spine cabling works. Roadworks scheduled 09/12/2025 - 10/12/2025 (BT)
| 09/12/2025 | 10/12/2025 | BT |
Impact: Medium | | 09/12/2025 | 11/12/2025 | BT |
Impact: Medium | | 09/12/2025 | 10/12/2025 | United Utilities Water |
Impact: Medium | | 09/12/2025 | 15/12/2025 | SP Energy Networks |
Impact: Medium | | 09/12/2025 | 03/01/2026 | Cadent |
Impact: Medium | Excavation for new service. 2 way lights off peak for all activities including excavations and jointing plus grab wagon and reinstatement activities....
Footway is wide so pedestrians can be kept on the footpath. Store spoil onto the verge area. Team to park within tm. 30 mph Roadworks scheduled 09/12/2025 - 15/12/2025 (Electricity North West Limited) - Traffic control (two-way signals)
| 09/12/2025 | 15/12/2025 | Electricity North West Limited |
Impact: Medium | EXCAVATE 3x JOINT BAYS IN THE FOOTWAY AND 1 X ROAD CROSSING (TO BE MOLED WHERE POSSIBLE) FOR UNLOOPING OF SHARED LV SUPPLY AND TO PROVIDE NEW SERVICE FOR CUSTOMER DRIVEN EVCP AND HEAT PUMP WORKS Roadworks scheduled 09/12/2025 - 15/12/2025 (SP Energy Networks)
| 09/12/2025 | 15/12/2025 | SP Energy Networks |
Impact: High | | 09/12/2025 | 15/12/2025 | United Utilities Water |
Impact: High | | 09/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: High | Cyclists Dismount/ no bus access/ residents access on foot/ ped access maintained. Emergency access will be maintained where possible Road closure scheduled 09/12/2025 - 11/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 09/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: High | | 09/12/2025 | 11/12/2025 | Virgin Media |
Impact: Medium | | 09/12/2025 | 10/12/2025 | Cheshire East Council |
Impact: Medium | Laying approx 50m of duct in the footway to connect to box already located in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 09/12/2025 - 12/12/2025 (BT)
| 09/12/2025 | 12/12/2025 | BT |
Impact: Medium | Fault repair works to put an end to an unplanned interruption of a Scottish Power Electricity supply cables including excavation and reinstatement Roadworks scheduled 09/12/2025 - 15/12/2025 (SP Energy Networks)
| 09/12/2025 | 15/12/2025 | SP Energy Networks |
Impact: Medium | | 09/12/2025 | 10/12/2025 | Cheshire East Council |
Impact: Medium | | 09/12/2025 | 15/12/2025 | SP Energy Networks |
Impact: Medium | IMMEDIATE WORKS TO PREVENT UNPLANNED INTERRUPTION OF SUPPLY PROVIDED BY UNITED UTILITIES - OPEN CUT EXCAVATION REQUIRED TO REPACK LEAK ON WATER VALVE AT DEPTH OF UNDER 1.5 METRES BY HAND AND MACHINE DIG IN CARRIAGEWAY Roadworks scheduled 09/12/2025 - 12/12/2025 (United Utilities Water) - Traffic control (multi-way signals)
| 09/12/2025 | 12/12/2025 | United Utilities Water |
Impact: Medium | | 09/12/2025 | 15/12/2025 | United Utilities Water |
Impact: High | | 09/12/2025 | 15/12/2025 | United Utilities Water |
Impact: High | | 09/12/2025 | 15/12/2025 | United Utilities Water |
Impact: Medium | | 09/12/2025 | 15/12/2025 | SP Energy Networks |
Impact: High | | 09/12/2025 | 15/12/2025 | United Utilities Water |
Impact: Medium | | 09/12/2025 | 15/12/2025 | United Utilities Water |
Impact: High | | 09/12/2025 | 10/12/2025 | National Highways |
Impact: High | | 10/12/2025 | 10/12/2025 | Electricity North West Limited |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 10/12/2025 - 12/12/2025 (BT)
| 10/12/2025 | 12/12/2025 | BT |
Impact: Medium | | 10/12/2025 | 10/12/2025 | SP Energy Networks |
Impact: Medium | | 10/12/2025 | 10/12/2025 | SP Energy Networks |
Impact: Medium | | 10/12/2025 | 10/12/2025 | SP Energy Networks |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 10/12/2025 - 12/12/2025 (BT)
| 10/12/2025 | 12/12/2025 | BT |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 10/12/2025 - 12/12/2025 (BT)
| 10/12/2025 | 12/12/2025 | BT |
Impact: High | | 10/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 10/12/2025 | 11/12/2025 | BT |
Impact: Medium | | 10/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: High | | 10/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: Medium | Excavate 3 x joint bays in the footway for customer driven LV service unlooping and to provide new service via road crossing followed by jointing activities, backfill and reinstatement. Roadworks scheduled 10/12/2025 - 16/12/2025 (SP Energy Networks)
| 10/12/2025 | 16/12/2025 | SP Energy Networks |
Impact: Medium | MJ QUINN ARE TO INSTALL 1 FLOORBOX, 1X DUCT TEE AND LAY APPROX 16M DUCT IN FOOTWAY/VERGE Roadworks scheduled 10/12/2025 - 12/12/2025 (BT)
| 10/12/2025 | 12/12/2025 | BT |
Impact: Medium | | 10/12/2025 | 12/12/2025 | BT |
Impact: Medium | MJ QUINN ARE TO INSTALL 1X POLE, X1 DUCT TEE, AND LAY 1M DUCT IN FOOTWAY/VERGE Roadworks scheduled 10/12/2025 - 12/12/2025 (BT)
| 10/12/2025 | 12/12/2025 | BT |
Impact: Medium | | 10/12/2025 | 12/12/2025 | Vodafone Group |
Impact: High | | 10/12/2025 | 10/12/2025 | Cheshire East Council |
Impact: High | | 10/12/2025 | 10/12/2025 | Cheshire East Council |
Impact: Medium | | 10/12/2025 | 10/12/2025 | BT |
Impact: High | | 10/12/2025 | 02/01/2026 | SP Energy Networks |
Impact: Medium | Laying approx 34m of duct in the carriageway to connect to box already located in the carriageway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 10/12/2025 - 12/12/2025 (BT)
| 10/12/2025 | 12/12/2025 | BT |
Impact: Medium | | 10/12/2025 | 11/12/2025 | BT |
Impact: Medium | | 10/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: High | | 10/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 10/12/2025 | 10/12/2025 | Cheshire East Council |
Impact: Medium | | 10/12/2025 | 11/12/2025 | National Highways |
Impact: High | | 10/12/2025 | 12/12/2025 | National Highways |
Impact: Medium | | 11/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 11/12/2025 - 12/12/2025 (BT)
| 11/12/2025 | 12/12/2025 | BT |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 11/12/2025 - 12/12/2025 (BT)
| 11/12/2025 | 12/12/2025 | BT |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 11/12/2025 - 12/12/2025 (BT)
| 11/12/2025 | 12/12/2025 | BT |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 11/12/2025 - 12/12/2025 (BT)
| 11/12/2025 | 12/12/2025 | BT |
Impact: High | | 11/12/2025 | 11/12/2025 | SP Energy Networks |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 11/12/2025 - 15/12/2025 (BT)
| 11/12/2025 | 15/12/2025 | BT |
Impact: Medium | | 11/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: Medium | | 11/12/2025 | 17/12/2025 | SP Energy Networks |
Impact: Medium | | 11/12/2025 | 17/12/2025 | SP Energy Networks |
Impact: Medium | | 11/12/2025 | 15/12/2025 | Netomnia Limited |
Impact: Medium | | 11/12/2025 | 15/12/2025 | Netomnia Limited |
Impact: Medium | | 11/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | | 11/12/2025 | 11/12/2025 | Cheshire East Council |
Impact: High | | 11/12/2025 | 12/12/2025 | National Highways |
Impact: High | | 11/12/2025 | 13/12/2025 | National Highways |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 12/12/2025 - 16/12/2025 (BT)
| 12/12/2025 | 16/12/2025 | BT |
Impact: Medium | | 12/12/2025 | 12/12/2025 | Zzoomm PLC |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 12/12/2025 - 16/12/2025 (BT)
| 12/12/2025 | 16/12/2025 | BT |
Impact: Medium | | 12/12/2025 | 16/12/2025 | BT |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 12/12/2025 - 16/12/2025 (BT)
| 12/12/2025 | 16/12/2025 | BT |
Impact: Medium | | 12/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: High | | 12/12/2025 | 14/12/2025 | SP Energy Networks |
Impact: High | | 12/12/2025 | 18/12/2025 | SP Energy Networks |
Impact: Medium | | 12/12/2025 | 12/12/2025 | BT |
Impact: High | | 12/12/2025 | 12/12/2025 | Zzoomm PLC |
Impact: Medium | | 12/12/2025 | 12/12/2025 | Cheshire East Council |
Impact: Medium | | 12/12/2025 | 13/12/2025 | National Highways |
Impact: Medium | | 13/12/2025 | 14/12/2025 | BT |
Impact: High | EXCAVATE 3x JOINT BAYS IN THE FOOTWAY AND 1 X ROAD CROSSING (TO BE MOLED WHERE POSSIBLE) FOR UNLOOPING OF SHARED LV SUPPLY AND TO PROVIDE NEW SERVICE FOR CUSTOMER DRIVEN EVCP AND HEAT PUMP WORKS FOLLOWED BY JOINTING ACTIVITIES AND REINSTATEMENT Roadworks scheduled 13/12/2025 - 19/12/2025 (SP Energy Networks) - Traffic control (multi-way signals)
| 13/12/2025 | 19/12/2025 | SP Energy Networks |
Impact: Medium | | 13/12/2025 | 14/12/2025 | United Utilities Water |
Impact: Medium | | 13/12/2025 | 14/12/2025 | National Highways |
Impact: High | | 13/12/2025 | 15/12/2025 | National Highways |
Impact: High | | 14/12/2025 | 14/12/2025 | BT |
Impact: High | | 14/12/2025 | 14/12/2025 | BT |
Impact: High | | 14/12/2025 | 15/12/2025 | ITS Technology Group |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 15/12/2025 - 17/12/2025 (BT)
| 15/12/2025 | 17/12/2025 | BT |
Impact: Medium | | 15/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: High | Diversion to be symbolised (8-9 Jul 25)
Access to be maintained as follows:
Emergency
Pedestrian
Cyclists Dismount Diversion route scheduled 15/12/2025 - 17/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/12/2025 | 17/12/2025 | Cheshire East Council |
Impact: High | Access maintained
Cyclist Dismount
Emergency Services
Resident
Pedestrians. Emergency access will be maintained where possible Road closure scheduled 15/12/2025 - 18/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/12/2025 | 18/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 19/12/2025 | United Utilities Water |
Impact: Medium | | 15/12/2025 | 19/12/2025 | SP Energy Networks |
Impact: Medium | MJ Quinn are to clear x2 blockages, and lay 12m duct Roadworks scheduled 15/12/2025 - 17/12/2025 (BT) - Traffic control (two-way signals)
| 15/12/2025 | 17/12/2025 | BT |
Impact: Medium | | 15/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 20/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 15/12/2025 | SP Energy Networks |
Impact: High | | 15/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: High | Access maintained for
Cyclists
Emergency Vehicles. Emergency access will be maintained where possible Road closure scheduled 15/12/2025 - 19/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 17/12/2025 | BT |
Impact: High | Cyclists Dismount
Emergency Vehicles
Resident
Pedestrians
Buses. Emergency access will be maintained where possible Road closure scheduled 15/12/2025 - 19/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 15/12/2025 | 17/12/2025 | BT |
Impact: Medium | | 15/12/2025 | 17/12/2025 | United Utilities Water |
Impact: Medium | | 15/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: Medium | | 15/12/2025 | 17/12/2025 | Cheshire East Council |
Impact: Medium | | 15/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | Access maintained
Cyclist Dismount
Emergency Services
Resident
Pedestrians. Emergency access will be maintained where possible Road closure scheduled 15/12/2025 - 19/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 15/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 15/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 15/12/2025 | 15/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 18/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 17/12/2025 | Cheshire East Council |
Impact: High | | 15/12/2025 | 16/12/2025 | National Highways |
Impact: High | | 15/12/2025 | 16/12/2025 | National Highways |
Impact: Medium | | 16/12/2025 | 16/12/2025 | BT |
Impact: High | EXCAVATE JOINT BAY IN THE FOOTWAY FOR UNLOOPING OF SHARED LV SUPPLY AND TO PROVIDE NEW SERVICE FOR CUSTOMER DRIVEN EVCP AND HEAT PUMP WORKS FOLLOWED BY JOINTING ACTIVITIES AND REINSTATEMENT Roadworks scheduled 16/12/2025 - 22/12/2025 (SP Energy Networks)
| 16/12/2025 | 22/12/2025 | SP Energy Networks |
Impact: High | | 16/12/2025 | 17/12/2025 | United Utilities Water |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 16/12/2025 - 18/12/2025 (BT)
| 16/12/2025 | 18/12/2025 | BT |
Impact: Medium | | 16/12/2025 | 18/12/2025 | United Utilities Water |
Impact: Medium | | 16/12/2025 | 18/12/2025 | BT |
Impact: Medium | S50 works to carry out trial holes and connect new gas service. Works to be completed by D&G Utilities LTD. Emergency contact number 07487 526 245 Roadworks scheduled 16/12/2025 - 18/12/2025 (Cheshire East Council) - Traffic control (two-way signals)
| 16/12/2025 | 18/12/2025 | Cheshire East Council |
Impact: Medium | | 16/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 16/12/2025 | 16/12/2025 | Cheshire East Council |
Impact: Medium | | 16/12/2025 | 16/12/2025 | Cheshire East Council |
Impact: High | | 16/12/2025 | 16/12/2025 | Cheshire East Council |
Impact: Medium | | 16/12/2025 | 16/12/2025 | Cheshire East Council |
Impact: High | | 16/12/2025 | 18/12/2025 | National Highways |
Impact: Medium | MJ Quinn are to lay 6m duct in carriageway, 34m duct in verge, 20m duct in footway, and install x2 floorboxes Roadworks scheduled 17/12/2025 - 22/12/2025 (BT)
| 17/12/2025 | 22/12/2025 | BT |
Impact: Medium | | 17/12/2025 | 23/12/2025 | SP Energy Networks |
Impact: Medium | | 17/12/2025 | 17/12/2025 | Cheshire East Council |
Impact: Medium | | 17/12/2025 | 17/12/2025 | Cheshire East Council |
Impact: Medium | Laying approx 33m of duct in the footway to connect to box already located in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 17/12/2025 - 19/12/2025 (BT)
| 17/12/2025 | 19/12/2025 | BT |
Impact: High | Access maintained
Cyclist Dismount
Emergency Services. Emergency access will be maintained where possible Road closure scheduled 17/12/2025 - 17/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 17/12/2025 | 17/12/2025 | Cheshire East Council |
Impact: Medium | | 17/12/2025 | 17/12/2025 | Cheshire East Council |
Impact: Medium | | 17/12/2025 | 18/12/2025 | National Highways |
Impact: High | | 17/12/2025 | 18/12/2025 | National Highways |
Impact: Medium | | 18/12/2025 | 19/12/2025 | BT |
Impact: Medium | | 18/12/2025 | 18/12/2025 | Cheshire East Council |
Impact: High | Cyclist access will be guided around closure. Emergency access will be maintained where possible Road closure scheduled 18/12/2025 - 18/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 18/12/2025 | 18/12/2025 | Cheshire East Council |
Impact: High | | 18/12/2025 | 18/12/2025 | Cheshire East Council |
Impact: High | Access maintained for
Cyclists Dismount
Emergency Vehicles
Resident
Pedestrians
Buses Diversion route scheduled 18/12/2025 - 19/12/2025 due to Roadworks / License - Roadworks works (Cheshire East Council)
| 18/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: High | Carriageway - Reconstruction/Repair - M6 northbound Junction 17 to Junction 17 - carriageway closure for carriageway - reconstruction/renewal Lane closure scheduled 18/12/2025 - 20/12/2025 (National Highways) - M6 Northbound lane 1 closure (MP 269/7 to 270/8). Left Permanent Lane 1 Closed
| 18/12/2025 | 20/12/2025 | National Highways |
Impact: Medium | | 18/12/2025 | 20/12/2025 | National Highways |
Impact: High | | 18/12/2025 | 19/12/2025 | National Highways |
Impact: Medium | | 19/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | | 19/12/2025 | 19/12/2025 | BT |
Impact: Medium | Install x4 new posts, clean and reattach x2 chevrons 09:30-14:30 Roadworks scheduled 19/12/2025 - 19/12/2025 (Cheshire East Council) - Traffic control (two-way signals)
| 19/12/2025 | 19/12/2025 | Cheshire East Council |
Impact: Medium | Barrier/Fence Safety Repairs - M6 northbound J19 to J20 - lane closure for barrier/fence safety repairs on behalf of National Highways Lane closure scheduled 19/12/2025 - 20/12/2025 (National Highways) - M6 Northbound Lane 1 closure (MP 289/5 to 295/2). Left Permanent Lane 1 Closed
| 19/12/2025 | 20/12/2025 | National Highways |
Impact: Medium | Maintenance dig required to expose a buried joint in the carriageway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 22/12/2025 - 24/12/2025 (BT)
| 22/12/2025 | 24/12/2025 | BT |
Impact: Medium | Laying approx 10m of duct in the carriageway to connect to box already located in the footway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 22/12/2025 - 24/12/2025 (BT)
| 22/12/2025 | 24/12/2025 | BT |
Impact: Medium | Maintenance dig required to expose a buried joint in the carriageway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 22/12/2025 - 24/12/2025 (BT)
| 22/12/2025 | 24/12/2025 | BT |
Impact: Medium | Maintenance dig required to expose a buried joint in the footway/carriageway to maintain and upgrade customer to fibre, change over of cables also required so full section will be rodded and roped Roadworks scheduled 22/12/2025 - 24/12/2025 (BT)
| 22/12/2025 | 24/12/2025 | BT |
Impact: High | | 22/12/2025 | 24/12/2025 | Cheshire East Council |