Fairground equipment or inflatables

Whenever fairground rides or attractions form either part of an event or are the main “attraction” the following should be provided to Cheshire East Council.

  • Number of devices or attractions
  • Details of device controllers
  • ADIPS ID number and current DOC for each device
  • Showman’s 9/1 – guild membership
  • £1m Excess cover
  • Risk assessment for each device

All documentation can be submitted via the event application form or the document upload form on the application page. This should be done 12 weeks before the start of the event.

The Health and Safety Executive have guidance for operators of fairground equipment and inflatables.

Risk Management Partners have guidance on inflatables.

Temporary staging, grandstands, tents or marquees

Where temporary structures are to be used organisers should take steps to ensure that contractors have appropriate skills, knowledge and experience.

Contractors should provide risk assessments and method statements (RAMS) along with proof of insurances (public, product and employers). RAMS should include actions to be taken in extreme weather conditions (e.g. high winds, rain, thunderstorms).

As an organiser you must ensure that the roles and duties Construction (Design and Management) Regulations 2015 (CDM 2015)HSE website are fulfilled. This includes ensuring that a construction phase plan should be completed for the build and take down periods of the event. Example of an event Construction phase plan.

It is recommended that marquee suppliers are members of the Made-Up Textiles Association Made-Up Textiles Association or other trade association.

All structures on site should be clearly identified on the site plan.

Market stalls and gazebos

You must erect stalls and gazebos according to the manufactures instructions. The structure must be correctly anchored and adequately spaced and must comply with fire regulations.

You should identify the location of these structures on a site plan.

The event organiser should review the use of these structures in adverse weather conditions including wind and heavy rain or as a shelter from the sun.