  • Carriageway - Reconstruction/Repair - M56 both directions J8 to J5 - carriageway closure for carriageway - reconstruction/renewal on behalf of National Highways

  • Roadworks scheduled 23/03/2026 - 30/10/2026 (National Highways)

  • WB 14/1+25 - 14/7+30, EB 11/6+35 (c/l J4 Simonsway) - 11/0+34 (end of J4 access), EB 12/4+50 = 12/1+40 (lane gain), EB 12/9+80 (lane drop @ J5 exit) - 12/7, WB 12/7 - 12/9+85, WB J5 access (from split with EB access - end at 12/9+85 lane gain), J5 Link from Airport to merge of EB & WB access slips, EB J5 access (from split with WB access - end at 12/1+40 lane gain), EB J5 exit (starts 12/9+80 lane drop - ends at merge with slip from WB), WB 12/9+85 (lane gain) - 13/5+90, EB 13/5+90 - 12/9+80 (lane drop J5 exit), EB 14/0+70 (lane gain J6 access) - 13/3+90, J5 link to Airport (from merge of WB & EB exits - end on Airport link road), WB J5 exit from 12/0+80 - merge with slip from EB, WB 11/8+40 (Main Line Section) - 12/0+80 (Double lane drop J5), WB 10/6+15 (lane gain) - 11/1+20 (start of J4 exit slip), WB 10/2+05 (lane gain) - 10/6+15 (end of slip from M60), EB 11/0+34 (end of J4 access) - 10/4+41 (start of link to M60), WB 13/5+90 - 14/1+25 (lane drop J6 exit), WB 10/0+52 (end of acces from A560) - 10/2+05 (lane gain), WB 19/74 - C/L bridge over - 20/76 - C/L A556 bridge over, WB J7 exit slip (starts 19/0+65 and ends at merge with slip from EB exit), WB 19/0+65 start of J7 A556 exit slip - 19/74 - C/L of bridge over, WB 18/0 - 19/0+65 (start of J7 exit - A556), WB 16/0 - 17/0, WB 15/5 - 16/0, WB 15/0 - 15/5, WB 14/7+30 - 15/0, WB J6 access (ends at 14/7+30), EB J6 exit slip (starts 14/7+25), EB 15/5 - 14/9+90, EB 16/0 - 15/5, EB 17/0 - 16/0, EB 18/0 - 17/0, EB 19/09 (End J7 Access) - 18/0, EB 19/74 - C/L bridge over - 19/0 - end of entry slip, M56 Jcn 7 access slip, EB 20/38 - start of J7 exit - 19/74 - C/L bridge over, EB 20/75 - C/L A556 bridge over - 20/38 - start of J7 A556 exit slip, EB 22/0 - 21/0, Bowdon R'bt A556/A56, EB Link to M60 (from lane drop at 10/4+41 - end at 9/0+15 c/l J3 A560), EB 12/7 - 12/4+50, EB 10/4+41 (start of link to M60) - 9/9+55 (start of exit to A560), EB exit slip to A560 (starts at 9/9+55), WB access slip from A560 - ends at 10/0+52, EB 21/0 - 20/75 - C/L A556 bridge over, EB 14/99 - 14/7+25 (Start of J6 exit A538), WB 17/0 - 18/0, WB 11/1+20 (start of exit slip J4) - 11/8+40 (lane drop at J5 exit), WB 12/0+80 - 12/7, EB (lane gain at J5 access) - 11/6+35 (c/l J4 Simonsway), EB 14/7+25 - 14/0+75, EB J6 access slip (ends at 14/0 +75 lane gain), WB J6 exit slip (starts at 14/1+25 lane drop), Northbound from M56 Roundabout exit slip to M56, Southbound from M56 Westbound Exit Slip, Northbound link between the two Bowden Roundabouts, Bowden Little Roundabout, M56 Westbound Exit slip. Link to Little Bowden Roundabout, M56 Eastbound J7 Exit Slip to merge from Westbound Exit Slip, M56 Westbound J7 exit link to Eastbound merge, J7 Eastbound Access slip from Bowden Roundabout

From: 23/03/2026

To: 30/10/2026

Responsiblilty: National Highways

Can't see map? Click the cross in the coloured bar below the date to close the info panel and reveal the map.

Page last reviewed: 27 August 2026