Roadworks: KL3370912 (Tilstone Bank Road, Bunbury)

Locations:

  • Tilstone Bank Road, Bunbury

Description:

  • Protecting work so parapet wall can be taken down and rebuilt to NWR standard. 22:30 - 06:30 Continuous road closure for duration of works.

  • Roadworks scheduled 17/10/2026 - 01/11/2026 (Network Rail Infrastructure Ltd)

  • At the railway bridge (road over rail)

From: 17/10/2026

To: 01/11/2026

Responsiblilty: Network Rail Infrastructure Ltd

Can't see map? Click the cross in the coloured bar below the date to close the info panel and reveal the map.

Page last reviewed: 27 August 2026