Locations:
Description:
To Install 1 X Short Sided 25MM PE NEW WATER CONNECTION AND TO INSTALL 1 X SHORT SIDED 63MM PE NEW WATER CONNECTION TO THE 6"PV MAIN
Roadworks scheduled 20/10/2026 - 22/10/2026 (United Utilities Water)
From: 20/10/2026
To: 22/10/2026
Responsiblilty: United Utilities Water
Can't see map? Click the cross in the coloured bar below the date to close the info panel and reveal the map.
Page last reviewed: 27 August 2026