Locations:
Description:
Need to Install 1x Long sided 110mm PE NAV Branch Water connection with 100mm Meter, Strainer + Non return valve and Long sided 1 X 25MM PE NEW CONNECTION
Roadworks scheduled 10/10/2026 - 16/10/2026 (United Utilities Water)
From: 10/10/2026
To: 16/10/2026
Responsiblilty: United Utilities Water
Can't see map? Click the cross in the coloured bar below the date to close the info panel and reveal the map.
Page last reviewed: 27 August 2026