NORTH RODE - WH5CK46J - Excavate to install approx. 50m of duct in the verge 50m west of track leading to Organic Farm and 1 underground BT box, 3m in the carriageway o/s Dobford Farm, then connect to the existing BT network. Also clear 6 x blockages in the verge and carriageway.
Roadworks scheduled 14/10/2026 - 20/10/2026 (BT)
From: 14/10/2026
To: 20/10/2026
Responsiblilty: BT