Resurfacing programme 2026
From September 2026, we will be starting our resurfacing programme across the borough.
The process involves removing the worn surface, repairing any defects and laying new asphalt to create a smooth, long-lasting finish, and reinstating the road markings. Resurfacing helps extend the life of the road, improves skid resistance, and reduces the need for future maintenance.
Changes to dates
The dates for these works may change and we may not be able to give you an exact date. This means works may be delayed or moved at short notice.
Signs will be placed on site to tell you:
- when the road will be closed
- the dates and times of the works
- how long the works are expected to last
Roads included in the programme
The roads listed below have been identified as part of our resurfacing programme for 2026-27. (All dates are weather dependent and subject to change).
Roads included in the 2026 surface dressing programme and planned work dates
| Road | Area | Dates of Works |
| |
|
|
| Cheshire Street - (Heathfield Road to Stafford Street) |
Audlem |
21 September until 30 September 2026 between 9:30am and 2:30pm |
| Rood Hill Roundabout (Mill Street to Mountbatten Way) |
Congleton |
1 October until 3 October 2026 between 7:00pm and 6:00am |
| Groby Road (Remer Street to Warmingham Road) |
Crewe |
5 October until 16 October 2026 between 9:30am and 2:30pm |
| Station Road (London Road to mini roundabout) |
Holmes Chapel |
21 October until 24 October 2026 between 7:00pm and 6:00am |
| |
|
|
| Flag Lane (Alton Street to zebra crossing) |
Crewe |
2 November until 5 November 2026 between 8:00am and 5:00pm |
| Newcastle Road (Main Road to borough boudary) |
Shavington/Hough/Weston |
6 November until 14 November 2026 between 7:00pm and 6:00am |
| Chapel Lane (Oak Lane to Alderley Road) |
Wilmslow |
18 November until 23 Novmber 2026 between 8:00am and 5:00pm
24 November until 27 November 2026 between 7:00pm and 6:00am
|
|
St Oswalds Crescent (School Lane to Newcastle Road)
|
Brereton |
30 November until 9 December 2026 between 8:00am and 6:00pm |
| Faddiley Bends (anti skid patch to first farm) |
Faddiley |
2 December until 5 December 2026 between 7:00pm and 6:00am |
|
|
| Minshull New Road (Badger Avenue to West Street) |
Crewe |
10 December until 16 December 2026 between 9:30am and 14:30pm |
|
|
|
|
For more information on dates of the road closures see OneNetwork (opens new window)
Access and parking
We are unable to carry out resurfacing works if vehicles are parked on the road.
Please make sure:
- your vehicle is moved from the road before the works start
- if you are going away during the works, please arrange for your vehicle to be moved from the road
Letters to residents and businesses
We will send a letter to all affected properties before the works begin.
Please note:
- the letter does not allow access through the road closure
- access may be restricted for safety reasons
If you have special access needs, please speak to the site supervisor as soon as possible.
Local businesses will remain open as normal. Access will be provided where it is safe to do so, or via diversion routes.
Road closures and diversion routes
Road closures are needed to keep both the public and our workforce safe.
Bus companies are aware of the works. Services may run on different routes or timetables, so please check the operator’s website.
Waste collection services will not be affected.
Further information
- Emergency services will always have access
- Local businesses will remain open
- Delays are likely – plan journeys ahead
- Do not park vehicles in the works area
Contact us
If you would like to speak to someone on site, the site supervisor is the best person to talk to.
You can also contact us on 0300 123 5025.
Page last reviewed: 19 August 2026
Thank you for your feedback.