Highway damage recovery claims (Green Claims)

Cheshire East Council seeks to recover the costs of repairing damage to highway assets and responding to certain incidents affecting the highway network where another party may be responsible for the damage or incident.

Helping to protect public funds

Cheshire East Highways manages an extensive highway network across the borough, including:

  • 1,688 miles of roads
  • 1,367 miles of footways and pedestrian routes
  • Cycle routes
  • Road signs
  • Street lighting
  • Traffic signals
  • Pedestrian crossings
  • Bridges and structures
  • Highway drainage assets

When damage occurs to highway infrastructure, or the Council incurs costs responding to incidents that affect the safe operation of the highway network, we may seek to recover those costs from the responsible party or their insurer.

This process is commonly known as a Green Claim.

Recovering these costs helps ensure that public funds can continue to be invested in maintaining and improving Cheshire East's highways.

What types of incidents may result in a claim

The Council may seek to recover costs arising from incidents including:

Damage to highway assets

  • Road traffic collisions involving highway infrastructure
  • Damage to road signs and street name plates
  • Damage to street lighting columns
  • Damage to traffic signals and pedestrian crossing equipment
  • Damage to safety barriers, bollards and guardrails
  • Damage to footways, verges and carriageways
  • Damage to bridges, retaining walls and other highway structures

Other incidents affecting the highway network

  • Obstructions affecting the safe use of the highway
  • Objects, materials or debris requiring removal from the highway
  • Incidents requiring emergency attendance by the Council
  • Activities resulting in damage to highway land or property
  • Other situations where the Council incurs costs in protecting highway users, making the highway safe or restoring normal use

Each case is assessed on its own facts and circumstances. Recovery action will only be pursued where evidence supports a claim.

How we recover costs

The Green Claims Team investigates reports of damage and other incidents affecting the highway network.

Information may be received from:

  • Cheshire Police
  • Emergency services
  • Highways Officers
  • Council contractors
  • Utility companies
  • Members of the public
  • Witnesses

The team gathers evidence, arranges inspections where necessary, calculates the costs incurred by the Council and seeks reimbursement where appropriate.

During 2024/25, the Green Claims Team successfully invoiced more than £1 million, helping to return valuable funding to the highways budget.

Recent damage to Highway Assets

Incident date: 16 October 2026

Location: Hulley Road, Macclesfield

Incident: Vehicle has collided with and damaged a keep left bollard that will need replacing.

Image of knocked over bollard

Traffic cone placed in the way of the knocked over bollard - for safety

Report damage to a highway asset

If you have witnessed an incident that has caused damage to Council-owned highway infrastructure, we would appreciate your assistance.

Information provided by members of the public can help us identify those responsible and recover costs incurred by the Council.

Information we may require

  • Date and time of the incident
  • Exact location
  • Description of the incident
  • Details of any damage caused
  • Vehicle registration details (where known)
  • Details of any person or organisation involved (where known)
  • Witness contact details
  • Photographs or video footage showing the incident or resulting damage
Email Highway damage recovery claims

Alternatively, telephone 0300 123 5020 and ask for the Green Claims Team.

Contact Highways

To report a Highways issue please follow the link below:

Report an issue on traCE.

If you consider a highways issue to be a danger to life:

Call the Highways Customer Services Team on 0300 123 5025

Page last reviewed: 27 November 2026