The scheme which was first mooted before the Second World War has now received funding approval from the Department of Transport. Cheshire East Council is to receive £48.224 million from the Government and will put in £3.424 million itself.

The five kilometre (3 miles) route runs to the west of Alderley Edge, starting at Harden Park roundabout and rejoins the existing A34 to the south of Nether Alderley village (a plan of the route that the new bypass will take can be viewed by using the link below). Birse Civils have been appointed as the Contractor for the main civil engineering works, they began work on site in January 2009 and will take approximately two years to complete the bypass.

Plan showing the route of the A34 Alderley Edge and Nether Alderley Bypass (PDF, 1.1MB)

Simulated tour of what the bypass will look like (WMV, 9.5 MB)

Latest News: 

The Alderley Edge and Nether Alderley Bypass will be officially opened on November 19th 2010 by the Right Honourable George Osborne, MP for Tatton .

Monks Heath / Bollington Lane improvements

As part of the works for the bypass, we have been upgrading Bollington Lane, including provision of traffic signals at either end, and constructing a southbound left-turn lane at Monks Heath. Work began early 2009 and are currently expected to take a few months to complete. The duration is due in part to the large number of utilities such as water, electrics, phone lines, etc, which need to be diverted. We are endeavouring to carry out as much work as possible during off-peak times.

Some of the work will involve the use of temporary traffic signals, however please be assured that the signals will be manually controlled during the working day and removed when safety permits.

Inevitably the Monks Heath works will cause some delay for which we apologise.  Thank you for your patience while the work takes place.

Reminder to all drivers

We would like to remind all drivers that use Nursery Lane and Sossmoss Lane that there is a legally enforceable one way gyratory system in operation for all traffic, at all times, (not just construction traffic). From the A535 Chelford Road eastwards towards Welsh Row, traffic must use Nursery Lane, and traffic from Welsh Row westwards to A535 must use Sossmoss Lane (an anticlockwise gyratory system). 